Call Us
QSERV Technical Services
Home
Services
Fire Protection Fire Alarm & Fighting Systems FM200 Suppression Kitchen Hood Fire System Fire Extinguishers Refilling Services Emergency Lighting Fire Door Installation & Certification
Mechanical & HVAC Lift & Elevators AC & Chillers
AMC
AMC Packages Fire Systems AMC Elevator AMC AC & Chiller AMC
About Us Blogs FAQ Contact
العربية +971 52 398 3804
Home
All Services Fire Alarm & Fighting FM200 Suppression Kitchen Hood Fire System Fire Extinguishers Refilling Services Lift & Elevators AC & Chillers Emergency Lighting Fire Doors
All AMC Packages Fire Systems AMC Elevator AMC AC & Chiller AMC
About Us Blogs FAQ Contact العربية
Call Now Call Us
Skip to main content
Legal Document

Terms of Service

Last updated: June 2026

Welcome to QSERV Technical Services LLC. By accessing or using our website and technical services, you agree to be bound by these Terms of Service. These terms are governed by and constructed in accordance with the laws of the Emirate of Dubai and the Federal Laws of the United Arab Emirates.

1. Services and DCD Approvals

QSERV provides Civil Defence-approved engineering, maintenance, fit-out, refilling, and AMC (Annual Maintenance Contract) solutions. All service agreements, equipment certifications, and drawing approvals are executed in compliance with the **UAE Fire and Life Safety Code of Practice** and require official Dubai Civil Defence (DCD) approval workflow registration.

2. User Obligations & Authority Submissions

When requesting engineering surveys, approvals, or AMC quotes, clients must provide verified building details, tenant Ejari, trade license copies, and approved base-building drawings. Clients are legally responsible for ensuring that their premises remain accessible, structural alterations are disclosed, and fire-fighting systems are not tampered with, in accordance with ministerial safety directives.

3. Service Delivery & Solenoid Interlocks

Our certified technicians perform all engineering tasks (such as kitchen hood wet-chemical installation, FM200 gas system verification, and Hassantuk integration) to NFPA standards. QSERV is not liable for operational delays or structural inspection failures caused by client-side default, base-building electrical supply issues, or unauthorized modifications to gas solenoid valves post-handover.

4. Limitation of Liability

To the maximum extent permitted by UAE law, QSERV's liability for any engineering defect or service delay is strictly confined to the values outlined in the specific, signed AMC or project contract. QSERV is not liable for force majeure events, power outages, authority network failures (such as regional Hassantuk offline triggers), or landlord-imposed lockouts.

5. Governing Law and Jurisdiction

Any dispute, claim, or controversy arising out of or in connection with these Terms, including any question regarding their existence, validity, or termination, shall be subject to the exclusive jurisdiction of the Courts of the Emirate of Dubai, United Arab Emirates.

6. Contact and Inquiries

For legal inquiries, contract review details, or terms clarification, please contact our legal representative at admin@qservuae.com.

QSERV - Quick & Quality Service

Trusted experts in fire safety, elevators, and MEP services. Civil Defence approved providing comprehensive AMC and installation solutions across the UAE.

+971 52 398 3804
04 572 9668
admin@qservuae.com
A019, First Gulf Business Centre
2nd St, Muhaisnah 4, Dubai, UAE

Our Services

  • Fire Systems AMC
  • Fire Alarm & Fighting
  • FM200 Suppression
  • Kitchen Hood Fire System
  • Fire Extinguishers
  • Refilling Services
  • Emergency Lighting
  • Fire Doors
  • Elevator AMC
  • AC & Chillers

Quick Links

  • About Us
  • Our Services
  • AMC Packages
  • FAQ
  • Contact Us

Support

  • Emergency Support
  • Get a Quote
  • Documentation
Complete Dubai fire safety service directory
  • Annual Fire Maintenance Contract Dubai
  • Central Battery System Maintenance Dubai
  • Civil Defence Inspection Dubai
  • Clean Agent Fire Suppression Dubai
  • CO2 Refilling Dubai
  • DCD Approved Fire Contractor Dubai
  • DCD Certificate Renewal Dubai
  • Elevator AMC Dubai
  • Emergency Lighting Maintenance Dubai
  • Emergency Lighting Systems Dubai
  • Exit Light Maintenance Dubai
  • Fire Alarm Maintenance Dubai
  • Fire Alarm Systems Hassantuk Dubai
  • Fire AMC Cost Dubai
  • Fire Door Installation Certification Dubai
  • Fire Extinguisher Maintenance Dubai
  • Fire Extinguisher Refilling Dubai
  • Fire Extinguisher Supplier Dubai
  • Fire Fighting Systems Dubai
  • Fire Pump Maintenance Dubai
  • Fire Safety Inspection Dubai
  • Fire System Takeover Rectification Dubai
  • Fire Systems AMC Dubai
  • FM200 Fire Suppression System Dubai
  • FM200 Maintenance Dubai
  • FM200 Refilling Dubai
  • Hassantuk Fire Alarm Integration Dubai
  • HVAC Chillers AMC Dubai
  • Kitchen Hood Fire Suppression Dubai
  • Kitchen Hood Maintenance Dubai
  • LPG Gas Systems Dubai
  • Multi Site Fire AMC Dubai
  • Refilling Services Dubai
  • Restaurant Fire Safety Approval Dubai
  • Server Room Fire Protection Dubai
  • Sprinkler System Maintenance Dubai
  • Warehouse Fire Safety Inspection Dubai

© 2026 QSERV Technical Services LLC. All rights reserved.

Privacy Policy Terms of Service Cookie Settings
Developed by Auronix
QS

QSERV Support

Typically replies in minutes

Hello! How can we help you with your fire safety or MEP requirements today?

Chat on WhatsApp Start a WhatsApp conversation
Call Helpline Dial +971 52 398 3804