Exit Light Maintenance in Dubai
Exit light maintenance in Dubai means a short monthly function test, a three-hour battery test once a year, and replacing failed lamps, batteries and damaged units so every exit stays lit when the power fails. QSERV maintains self-contained and central battery exit lights in Dubai buildings and logs every result for Civil Defence.
DCD-approved · 12+ years in Dubai fire safety · Hassantuk-integrated · 18,000+ customers served
Two tests: a quick one monthly, a long one yearly
Dubai buildings follow the UAE Fire and Life Safety Code, which expects emergency lighting and exit lights to run for three hours on battery. Every month, each exit light is switched to battery for a short test to prove it changes over. Once a year, it runs on battery for the full three hours.
The annual test is the one that finds tired batteries. A light can pass every monthly test and still go dark an hour into a real outage.
- Monthly short changeover test.
- Annual three-hour discharge test.
- Charging indicator and fault light checks.
- Results recorded fitting by fitting.
Self-contained and central battery exit lights
Self-contained exit lights carry their own battery, so each fitting is tested and replaced on its own. Central battery systems feed many fittings from one cabinet, so the cabinet, its batteries and the circuits are tested together.
QSERV identifies which type you have, then sets the test plan to match.
- Self-contained fittings: battery, lamp and charger per unit.
- Central battery: cabinet batteries, charger and circuit checks.
- Directional arrows checked against the current escape route.
- Units blocked by fit-out partitions reported.
Fixing what fails
Most failures are batteries that no longer hold charge, failed lamps or LED drivers, and fittings damaged during ceiling work. We replace batteries and parts where the fitting allows it and quote replacement units where it does not.
Repairs are retested before the visit is closed, so the record shows a working light rather than a promise.
Answers, Before You Ask
Answers on exit light maintenance and testing for Dubai buildings.
01 How often should exit lights be tested?
Each exit light gets a short function test every month and a full three-hour duration test once a year, the pattern used for emergency lighting under the UAE Fire and Life Safety Code. Every result should be recorded.
02 How long should an exit light stay on during a power cut?
In the UAE, emergency lighting and exit lights are expected to stay lit for three hours on battery. That is longer than the 90 minutes found in some international codes, so imported fittings must be rated for three hours.
03 Why does my exit light have a red or flashing indicator?
It usually means a battery, charger or lamp fault. The fitting may still light on mains power but fail on battery, so it should be tested and repaired.
04 Can an exit light battery be replaced?
In most self-contained fittings, yes. Where the battery is not replaceable or the fitting is damaged, the whole unit is replaced.
05 Who maintains exit lights in Dubai?
An approved fire and life safety contractor, usually under the building fire AMC. QSERV maintains exit lights and emergency lighting for Dubai commercial, residential and industrial buildings.
06 Can exit light maintenance be part of a fire AMC?
Yes. Exit lights and emergency lighting are normally included in a fire systems AMC, with the monthly and annual tests built into the visit plan.