Updated 22 June 2026 | Jebel Ali Free Zone

Fire Safety AMC for JAFZA Facilities

A JAFZA fire safety AMC is a DCD-attested annual maintenance contract covering scheduled inspection, testing and rectification of the fire alarm, sprinklers, hose reels, extinguishers and fire pump installed at your Jebel Ali Free Zone facility.

DCD-approved · 12+ years in Dubai fire safety · Hassantuk-integrated · 18,000+ customers served

DCD-approved JAFZA tenants Quarterly PPM Smart monitoring Test certificate ready
DCD-approved fire safety AMC for a JAFZA warehouse facility
DCDAttested AMC
4xPPM visits / year
24/7Smart monitoring
Why JAFZA needs it

A valid, DCD-attested AMC is mandatory in JAFZA

JAFZA requires tenants with installed fire protection systems to keep a valid and attested DCD annual maintenance contract, with systems regularly inspected and maintained by a DCD-approved contractor. The AMC is what keeps your systems healthy between annual tests.

  • DCD-attested annual maintenance contract for your plot.
  • Monthly functional checks and quarterly preventive maintenance.
  • Defect rectification before the annual test, not after.
  • Service records aligned with the annual fire test certificate.
  • Fire alarm connection to Dubai Civil Defence 24x7 smart monitoring.
Fire alarm inspection under a JAFZA fire safety AMC
Systems covered

Every system JAFZA expects you to maintain

The AMC scope matches the JAFZA test requirement: smoke detectors, fire alarm, extinguishers, sprinklers, hose reels and the fire pump. Each is inspected, tested and documented so the annual third-party certificate is a formality.

  • Smoke detectors and fire alarm panel, sounders and batteries.
  • Fire extinguishers — pressure, tagging, placement, refilling.
  • Sprinkler risers, valves, gauges and hose reels.
  • Fire pump room — main, jockey and diesel pump checks.
  • Emergency lighting and exit signage where installed.
Fire pump and sprinkler maintenance for a JAFZA AMC
One partner

AMC and annual certificate from one DCD-approved team

Running the AMC and the annual fire test certificate through one DCD-approved partner keeps the maintenance trail and the final certificate aligned. The team that maintains your systems all year is the team that certifies them.

  • No gaps between maintenance records and the certificate.
  • Plot number carried correctly onto the test certificate.
  • Single point of accountability for JAFZA compliance.
  • Faster renewals and fewer rejected documents.
  • Continuity year over year.
JAFZA warehouse fire compliance records under one AMC partner
Frequently asked questions

Answers, Before You Ask

Answers for JAFZA facility managers and warehouse operators arranging a fire safety AMC.

01 Is a fire safety AMC mandatory for JAFZA tenants?

Yes. JAFZA requires tenants with installed fire protection systems to hold a valid and attested DCD annual maintenance contract and to have those systems regularly inspected and maintained by a DCD-approved contractor.

02 What does a JAFZA fire safety AMC cover?

It covers scheduled inspection, testing, cleaning and defect rectification of the smoke detectors, fire alarm, extinguishers, sprinklers, hose reels and fire pump installed at your facility, plus smart monitoring interface checks.

03 Is the AMC the same as the annual fire test certificate?

No. The AMC is the ongoing maintenance agreement through the year; the annual fire test certificate is the dated document a DCD-approved third party issues each year with your plot number. JAFZA requires both.

04 How often are AMC visits scheduled?

Most JAFZA facilities run monthly functional checks and quarterly preventive maintenance visits under the AMC, so systems pass the annual third-party test without surprises.

05 Can QSERV take over an existing JAFZA AMC?

Yes. Takeover starts with a technical audit of the current systems and records, followed by a defect list and a maintenance plan to stabilise the facility before the next annual test.

Need assistance with Fire Safety AMC for JAFZA Tenants?