Survey
Site assets, drawings, panels, cylinders, pumps, lighting and maintenance history are checked before work is scoped.
QSERV helps building owners, facility managers and fit-out teams choose the right fire protection services Dubai needs. We handle fire alarm maintenance, firefighting systems, FM200, kitchen hood suppression, extinguishers, emergency lighting and Civil Defence approvals.
From minor fit-out approvals to comprehensive building systems, QSERV provides certified technical expertise to keep your premises Civil Defence compliant and fully protected.
Complete support for shops, warehouses, offices and building handovers. We manage Civil Defence portal uploads, drawings, and testing to secure approvals quickly.
Our mobile engineering teams are stationed across Dubai, ready to resolve active alarm faults, suppression system leaks, and pump failures around the clock.
Select from our range of DCD approved fire safety, building suppression, compliance, and climate control services.
Fire alarm installation, takeover, fault rectification and Hassantuk fire alarm Dubai support for towers, fit-outs, villas, shops and warehouses.
Suppression FM200 fire suppression system Dubai service for server rooms, control rooms, data centers and critical equipment spaces.
Suppression Kitchen hood fire suppression Dubai service for restaurants, cafeterias, hotels, cloud kitchens and central kitchens.
Equipment DCD approved fire extinguisher supply Dubai service, including installation, certification, inspection and Civil Defence approved refilling.
Compliance & AMC Fire fighting AMC Dubai support for fire alarm, fire pump maintenance Dubai, sprinklers, hose reels, FM200 and DCD-ready service reports.
Equipment Extinguisher recharge, FM200 and CO2 support, AC gas top-up and hydrostatic pressure testing coordination.
Building Safety Emergency lighting maintenance Dubai for exit signs, central battery systems, 3-hour testing, lux checks and battery replacement.
Building Safety We certify existing fire doors door by door, repair failures and install new certified FD30 to FD120 doorsets with a door register for your DCD file.
HVAC & Elevators HVAC and chiller AMC for commercial cooling systems, AHU, FAHU, filters, coils, refrigerant checks and planned maintenance.
HVAC & Elevators Elevator AMC Dubai for passenger lifts, escalators, villa lifts, freight lifts and service lifts with inspection reports and breakdown support.
Find the specific support your building needs for Civil Defence readiness, AMC visits, emergency faults, refilling, FM200, pumps, sprinklers, exit lights and kitchen fire safety.
Civil Defence renewal support for documents, system checks, urgent defects, AMC records and inspection readiness.
Fire alarm, firefighting, FM200, emergency lighting, extinguishers, AMC and defect rectification support.
Pre-inspection readiness checks for fire alarm, firefighting, emergency lighting, extinguishers and reports.
Site inspection and defect audit for buildings preparing for renewal, takeover, handover or authority visits.
Fire pumps, sprinklers, hose reels, hydrants, risers, valves, gauges, maintenance and rectification.
Annual fire AMC planning for alarm, firefighting, FM200, extinguishers, emergency lights and reports.
Panel faults, detector testing, sounders, batteries, loop observations, Hassantuk notes and AMC reporting.
Monitoring readiness, interface observations, fire alarm takeover, documentation and maintenance support.
Main pumps, jockey pumps, diesel pumps, controllers, pressure readings, valves and pump room checks.
Risers, valves, gauges, flow switches, tamper switches, visible pipework and warehouse sprinkler checks.
Warehouse checks for sprinklers, pumps, extinguishers, emergency lights, exits, racking and DCD readiness.
Restaurant and cloud kitchen checks for hood suppression, gas shutoff, alarms, extinguishers and records.
Pricing factors for fire alarm maintenance, firefighting AMC, emergency response, scope and reporting.
Clean agent cylinder checks, release panels, nozzles, room integrity, warning devices and DCD records.
FM200 cylinder recharge after discharge, leakage, failed weight checks, hydrotesting or recommissioning.
Clean agent and FM200 systems for server rooms, data rooms, electrical rooms and critical spaces.
Server room fire protection with FM200, detection, release controls, room integrity and refill planning.
Wet chemical cylinders, nozzles, fusible links, manual release, gas shutoff checks and service records.
Inspection, tagging, pressure checks, refilling, hydrotesting coordination and replacement recommendations.
CO2, DCP, foam and wet chemical extinguisher refilling with tagging and service record support.
Exit signs, emergency luminaires, batteries, central battery systems, duration tests and DCD records.
Illuminated exit signs, battery checks, failed unit notes, escape route visibility and service records.
CBS panels, battery cabinets, output circuits, connected exit signs, emergency lights and duration testing.
CO2 extinguisher and fire cylinder refilling with pressure checks, tagging and hydrotesting coordination.
LPG and gas safety support for commercial kitchens, leak detection, shutoff valves and fire safety coordination.
Site assets, drawings, panels, cylinders, pumps, lighting and maintenance history are checked before work is scoped.
Alarm faults, pump issues, sprinklers, hose reels, extinguishers, kitchen hood defects and emergency lights are closed.
Functional checks, alarm response, battery checks, pressure checks and cylinder observations are completed.
Service reports, defect notes, compliance records and Civil Defence renewal support documents are prepared.
AMC visits, emergency response, asset tracking and planned follow-up keep the site inspection-ready.