Contact QSERV
24/7 Support

Get In Touch

24/7 Emergency Response & Professional Fire Safety Solutions

Get In Touch

Contact QSERV Fire Safety
Dubai & UAE

Get a free quote for fire alarm systems, FM200 suppression, or Annual Maintenance Contracts. DCD approved fire safety company serving Dubai, Abu Dhabi, and Sharjah with 24/7 emergency response.

Phone
+971 52 398 3804
Landline
04 572 9668
Email
admin@qservuae.com
Location
A019, First Gulf Business Centre, 2nd St, Muhaisnah 4, Dubai, UAE
Hours
24/7 Emergency Service

Send us a Message

Optional: Provide details about your requirements

We respond to all inquiries within 24 hours

Fast, practical support

What QSERV can help you solve

Tell us what is happening at the building. We will route the request to the right fire safety team and explain the next step. Clear details help us respond faster and avoid an unnecessary second visit.

Emergency system fault

Call when a fire alarm panel shows a fault, a pump will not start, a sprinkler valve is leaking, or an emergency light has failed. Share the building name, location, panel or system type, and any fault code you can see. A clear photo helps the technician prepare before arrival.

For urgent support, call +971 52 398 3804. Do not silence or isolate a life-safety system unless an authorised person confirms the safe procedure.

DCD inspection and renewal

Contact us if a Dubai Civil Defence inspection is due, a certificate needs renewal, or an open defect must be closed. Send the inspection date, previous report, asset list, and current AMC details if they are available. We can then plan the survey, testing, rectification, and records in the right order.

QSERV supports fire alarm systems, fire fighting systems, pumps, sprinklers, hose reels, extinguishers, FM200, kitchen hood suppression, emergency lighting, and Hassantuk integration.

New service or AMC quote

For a new installation or annual maintenance contract, tell us the property type, approximate size, number of floors, and systems on site. Include the required start date and whether the request covers maintenance, repair, supply, installation, or takeover from another contractor.

We will confirm the survey scope before pricing. You can also review our fire systems AMC, fire alarm system, and fire extinguisher Dubai services first.