REFILLING OF FIRE EXTINGUISHERS AND FIRE SUPPRESSION SYSTEM

  • Home
  • REFILLING OF FIRE EXTINGUISHERS AND FIRE SUPPRESSION SYSTEM
Qservuae
Qservuae
QservuaeRefilling of Fire Extinguishers and FM 200

Qserv technical services offers refilling of various portable and non-portable firefighting liquids and gases. Qserv is offering quality refilling at cheap prices

Following are the items we refill

  1. CO2 Fire Extinguisher and Trolleys
  2. Dry Chemical Powder Fire Extinguishers and Trolleys
  3. Foam Fire Extinguishers
  4. Water Fire Extinguishers
  5. FM200 System
  6. Aerosol System
  7. Kitchen hood system
  8. Foam Deluge System
How do Inert Gases work as a fire suppression system.

There is approximately 21% of Oxygen in the air we breath. Oxygen is the team leader in a fire in helping spreading of fire as well as we require oxygen to be alive.

By removing the oxygen, we will reach the aim to extinguish a fire, but that faces other problems.  How do we maintain the oxygen level required to keep us alive at the same time?

More than 15% Oxygen is required by the fire to start burning.  If the level of oxygen is below this, then it will not be enough for a fire to sustain combustion.  

In reality. we only need 12% and more of oxygen to keep us alive. To extinguish fire and sustain our life, there is a need to decrease level of oxygen from 21% to a lower level of 15%, but not less than 12%.  This will extinguish fire and helps in keeping us alive without any suffocation at the same time.