AIR CONDITIONERS & CHILLERS AMC

  • Home
  • AIR CONDITIONERS & CHILLERS AMC
Qservuae
Qservuae
QservuaeHVAC Annual Maintenance

Qserv provides Annual Maintenance Contracts (AMC) for air conditioning systems for private and corporate sectors. We realize in our region, where the climate is predominantly hot and humid, we can’t afford to have any breakdowns or lack of cooling for our AC systems.

With the immense experience and understanding of customers needs, we have gained expertise in AC Cleaning Contracts and established Qserv as one of the best annual ac maintenance service companies in Dubai. Our skilled technicians provide you with top-quality services making sure your home and work environment’s cooling needs are met.

Quick, Quality and Low-cost are the cornerstones of our annual maintenance contract. This includes replacement cleaning of air filters, coils and the complete system

Types of Annual Maintenance Contract (AMC)

We provide AMCs for Residential and Corporate clients, and it includes the following:

  • Two Major Services: Dismantling the components of the AC system and cleaning them remotely
  • Two minor services: Cleaning the filters, maintaining the cool temperature by re-filling gas if needed
  • On-Call for any ad-hoc installations and repairs

The AC cleaning Dubai agreement covers periodic monthly preventive maintenance for air conditioning equipment.

The air conditioning maintenance contract aims to prevent future problems with your air conditioning equipment, such as leaks, breakage of parts, and loaves in general through an annual maintenance plan subdivided into monthly maintenance.

Although it is possible to wash the air conditioning filter at any time, it is very important to do deep AC cleaning in Dubai at least once a year, or even every 3 months depending on the circumstances and the environment in which the air conditioner is installed.

Monthly AC cleaning & AC maintenance Dubai routine includes:

  • Check for abnormal noise and vibrations
  • Inspect air filters and clean
  • Check condensate drain
  • Check that the air return is clear
  • Check room temperature control thermostat setting

Quarterly AC cleaning & AC maintenance Dubai routine includes:

  • Check bushes and bearings
  • Check high and low pressure
  • Check the condition of the streamers
  • Check the electrical power

Annual AC cleaning & AC maintenance Dubai routine includes:

  • Cleaning the condenser unit with the use of a high-pressure (jet) pump with a chemical if necessary
  • Cleaning the evaporator unit
  • Eliminate rust spots
  • Reattach bearing bolts and brackets
  • Re-tighten terminals, screws, and springs

The Qserv Advantage

  • Affordable and transparent prices for maintenance and repair
  • Our experienced team will enable quick, quality & timely service
  • We understand the need of timely quick response in times of breakdown.
  • We work closely with clients to provide low cost solutions to their cooling needs
  • We deal with all kinds of brands and spare parts for repair